p_4.gif
 
    LOGO_logo_green.JPG

    AWARDS

    QM Com Gold 07 CMYK

    p_1.gif

    HOY_2009_QM_Com___CMYK_Silver_1.jpg

    HOY_2009_QM_Com___CMYK_Cat_Winner.jpg

 

         CYB

  RACING TEAM

P4170023 3


 
 
 

 

 

  

  

Civil Engineering

CPP_025.jpgWe have carried out numerous civil engineering works; including the upgrade of the Otira substation, all concrete work for the Pike River Coal Processing Plant, New Pumphouse for Pike River Coal, underground civil and concrete works for Pike River and Solid Energy (Spring Creek Mine).

Our fleet of heavy equipment
, enables us to take on any challenge. The fleet includes 3 diggers, a telehandler, scissor lifts and crawler boom, our own 30-tonne Kato hydraulic truck crane and a Hiab 477-7 mounted on an Isuzu 8x4 truck

Our staff are skilled and trained in underground work, as well as working at heights.
CYB_Logo_186x48.gif P: 03 762 6040       F: 03 762 6090       E: office@cybl.co.nz